Walls for the second heating stove are now ready. These walls have been long gone when we received both cars, but the new once were built according to model of the remaining walls. Also the metal sheeting of the walls had gone so a brand new sheeting was made according to the model of found in the other car.

Also all the legs of the benches have been now painted. The legs were painted three times and lightly sanded after each painting to get a nice and shiny result.