Photos of making super heater elements

tulistimet

tulistin

Renovation work is progressing rapidly

At the moment work is at the following phase: The steam pipes are installed but no yet isolated. Ashbox and its opening mechanism are completed but not yet painted. The brake levers are installed and the drain pipe of the smokebox is ready.

Next phase is installing the oil pipes of the truck pivots and installation of the side rods. After that the locomotive can be lowered back to its wheels and rails!